Serra School

Lieu: Rancho Santa Margarita , Architecte: LPA, Entreprise Générale: Foster Flooring, Mètres Carrés: 1500m2,

Catégories: Ecoles

This private middle school originally had a synthetic floor specified for the project.

During construction, the synthetic floor manufacturer advised the bleacher system was too heavy, and they could not guarantee their floor.  This caused the architect to look into low profile, solid hardwood floor systems. Junckers Clip System is the lowest profile system on the market and was able to be installed quickly without extensive transition pieces to adjacent floors.  

1500 m² of Solid hardwood Beech was chosen for this project.

Read about Junckers Clipsystem

picture.jpg
Choix des lames

Sols sportifs - Hêtre SylvaSport

systèmes sportifs

FLOTTANT PAR CLIPS | Parquets et sols sportifs