DuoBat 120+

Pre-installation and storage

Start-up: Moisture barrier

Step 1: Face wall battens

Step 1: Start and spacing battens

Step 1: Calculator (Distance A)

Step 1: String marker (J-lock line A)

Step 2: Gable battens

Step 2: Upper battens (second row)

Step 2: Temporary support

Step 2: Lower battens

Step 2: Upper battens (every fifth)

Levelling: Even subfloor

Levelling: Uneven subfloor

Step 3: Upper battens (remaining)

Floor boards: Center floor board and loose tongues

Floor boards: Floor pattern

Floor boards: 10-board measurement

Floor boards: Nailing and last row floor board

Skirtings

Bushings